# Map **By:** How we count **Published:** 2026-11-18 **Source:** [Data Center Record](https://datacenterrecord.org/map) --- # Where the projects are. 1,317 verified data center sites (1,373 total tracked records, including 56 not yet verified), 2,092 buildings where disclosed across 51 U.S. jurisdictions. Select any state or facility to inspect its primary record. Tap a state to open it, then a pin for the data center, a county for its rules The map needs JavaScript. The same projects are listed below, with the same information. - Running **745** - Being built **85** - Proposed **463** - Stalled or cancelled **24** - Not yet verified **56** Shade by local rules - Open - Case by case - Restrictive - Closed - No rule on the record A state is colored by its own state level rule alone; inside a state, a county or city is shaded where it has passed a rule of its own. A county's rule never colors its state. The scorecard on each state page has every rule and its source. Shade by regional wholesale electricity price effect (Dallas Fed WP 2606r1, third party estimate) - Under 5.0 percent modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate - 5.0 to 9.9 percent modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate - 10.0 to 14.9 percent modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate - 15.0 percent or more modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate Every shaded value is a 2024 to 2025 modeled wholesale electricity price effect from [Federal Reserve Bank of Dallas Working Paper 2606r1 (opens in a new tab)](https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf) (March 2026, revised October 2026), third party estimate. Select any state on the map or any regional power market below to open the Study Ledger and regional page. Nothing on this map is estimated; every project links to its primary record. [Methodology and boundary sources →](https://datacenterrecord.org/methodology) ## All U.S. Explorer 1,317 verified sites · 2,092 buildings · 51 states & DC - 61 running · 1 building · 131 proposed · 12 local rules - 33 running · 23 building · 46 proposed · 17 local rules - 71 running · 2 building · 9 proposed · 13 local rules - 19 running · 3 building · 57 proposed · 12 local rules - 57 running · 10 building · 2 proposed · 12 local rules - 45 running · 1 building · 11 proposed · 17 local rules - 28 running · 3 building · 11 proposed · 15 local rules - 22 running · 0 building · 17 proposed · 5 local rules - 29 running · 3 building · 2 proposed · 7 local rules - 29 running · 2 building · 3 proposed · 6 local rules - 29 running · 0 building · 3 proposed · 11 local rules - 28 running · 1 building · 3 proposed · 8 local rules - 10 running · 5 building · 13 proposed · 17 local rules - 23 running · 1 building · 4 proposed · 9 local rules - 20 running · 1 building · 6 proposed · 20 local rules - 27 running · 0 building · 1 proposed · 4 local rules - 17 running · 3 building · 6 proposed · 10 local rules - 22 running · 1 building · 3 proposed · 8 local rules - 13 running · 5 building · 7 proposed · 13 local rules - 12 running · 2 building · 10 proposed · 13 local rules - 16 running · 1 building · 7 proposed · 8 local rules - 14 running · 1 building · 5 proposed · 6 local rules - 16 running · 2 building · 1 proposed · 10 local rules - 10 running · 3 building · 6 proposed · 5 local rules - 13 running · 0 building · 4 proposed · 9 local rules - 13 running · 1 building · 2 proposed · 2 local rules - 12 running · 0 building · 0 proposed · 5 local rules - 8 running · 0 building · 0 proposed · 3 local rules - 3 running · 2 building · 0 proposed · 2 local rules - 1 running · 2 building · 0 proposed · 8 local rules - 3 running · 0 building · 2 proposed · 7 local rules - 2 running · 1 building · 2 proposed · 3 local rules - 3 running · 0 building · 2 proposed · 6 local rules - 0 running · 1 building · 2 proposed · 1 local rule - 2 running · 0 building · 2 proposed - 1 running · 1 building · 1 proposed · 5 local rules - 1 running · 2 building · 0 proposed · 1 local rule - 2 running · 0 building · 1 proposed · 6 local rules - NH New Hampshire 6 [Hub →](https://datacenterrecord.org/states/nh "Open New Hampshire hub") 3 running · 0 building · 0 proposed · 3 local rules - SD South Dakota 6 [Hub →](https://datacenterrecord.org/states/sd "Open South Dakota hub") 3 running · 0 building · 1 proposed · 1 local rule - WV West Virginia 6 [Hub →](https://datacenterrecord.org/states/wv "Open West Virginia hub") 0 running · 0 building · 4 proposed - 4 running · 0 building · 0 proposed · 3 local rules - 0 running · 0 building · 1 proposed · 1 local rule - 3 running · 0 building · 1 proposed · 8 local rules - 2 running · 0 building · 1 proposed · 1 local rule - 4 running · 0 building · 0 proposed · 1 local rule ## State ## Browse by state (A to Z) Verified records per state and DC (1,317 total) ## Regional power markets and wholesale electricity price effects Toggle the wholesale electricity price effect layer on the map above or select any of the 23 regional power markets below to inspect tracked data center records alongside modeled wholesale price effects from [Federal Reserve Bank of Dallas Working Paper 2606r1 (opens in a new tab)](https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf) (March 2026, revised October 2026, third party estimate) and the full Study Ledger. | Grid region | States | Tracked records ([CC BY-NC 4.0](https://datacenterrecord.org/about#commercial)) | 2024 to 2025 wholesale price effect | 2028 projected wholesale price effect | | --- | --- | --- | --- | --- | | [Northwest Power Pool (NWPP)](https://datacenterrecord.org/grid/nwpp) | WA, OR, ID, MT, NV, UT | 120 | 15.4 percent (+$5.68 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 25.9 percent (+$7.77 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [SERC Virginia and Carolina North (SRVC-N)](https://datacenterrecord.org/grid/srvc-n) | VA, NC | 194 | 15.0 percent (+$5.22 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 27.6 percent (+$9.76 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [WECC California (CAMX)](https://datacenterrecord.org/grid/camx) | CA | 82 | 8.6 percent (+$3.70 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 17.2 percent (+$6.96 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [MRO West (MROW)](https://datacenterrecord.org/grid/mrow) | IA, MN, ND, NE, SD | 75 | 12.1 percent (+$3.45 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 15.7 percent (+$4.59 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [ERCOT All (ERCT)](https://datacenterrecord.org/grid/erct) | TX | 69 | 12.6 percent (+$3.15 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 28.0 percent (+$6.10 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [SERC Virginia and Carolina South (SRVC-S)](https://datacenterrecord.org/grid/srvc-s) | NC, SC | 47 | 7.5 percent (+$3.01 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 14.7 percent (+$4.94 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [WECC Southwest (AZNM)](https://datacenterrecord.org/grid/aznm) | AZ, NM | 40 | 8.6 percent (+$2.93 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 14.7 percent (+$4.32 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [WECC Rockies (RMPA)](https://datacenterrecord.org/grid/rmpa) | CO, WY | 37 | 7.7 percent (+$2.51 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 12.2 percent (+$3.76 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [NPCC NYC and Westchester (NYCW)](https://datacenterrecord.org/grid/nycw) | NY | 13 | 5.2 percent (+$2.46 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 6.0 percent (+$2.63 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [NPCC Long Island (NYLI)](https://datacenterrecord.org/grid/nyli) | NY | 3 | 4.5 percent (+$2.40 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 5.3 percent (+$2.62 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [RFC West (RFCW)](https://datacenterrecord.org/grid/rfcw) | IN, OH, PA, WV, IL | 149 | 6.7 percent (+$2.29 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 15.7 percent (+$5.11 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [NPCC Upstate New York (NYUP)](https://datacenterrecord.org/grid/nyup) | NY | 16 | 5.3 percent (+$2.14 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 8.7 percent (+$3.34 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [SERC Tennessee Valley (SRTV)](https://datacenterrecord.org/grid/srtv) | KY, TN | 29 | 5.8 percent (+$2.03 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 8.7 percent (+$2.91 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [SPP North (SPNO)](https://datacenterrecord.org/grid/spno) | KS, NE, MO | 8 | 6.5 percent (+$1.87 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 8.2 percent (+$2.54 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [RFC East (RFCE)](https://datacenterrecord.org/grid/rfce) | DC, DE, MD, NJ, PA | 123 | 5.1 percent (+$1.81 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 13.3 percent (+$4.61 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [SERC South (SRSO)](https://datacenterrecord.org/grid/srso) | AL, GA | 115 | 4.2 percent (+$1.47 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 5.3 percent (+$1.73 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [SERC Midwest (SRMW)](https://datacenterrecord.org/grid/srmw) | IL, MO | 30 | 4.7 percent (+$1.46 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 7.0 percent (+$2.28 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [MRO East (MROE)](https://datacenterrecord.org/grid/mroe) | WI, MI | 21 | 4.0 percent (+$1.39 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 7.9 percent (+$2.60 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [NPCC New England (NEWE)](https://datacenterrecord.org/grid/newe) | CT, MA, ME, NH, RI, VT | 40 | 2.4 percent (+$1.28 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 3.1 percent (+$1.71 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [RFC Michigan (RFCM)](https://datacenterrecord.org/grid/rfcm) | MI | 25 | 3.8 percent (+$1.27 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 8.8 percent (+$2.89 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [SPP South (SPSO)](https://datacenterrecord.org/grid/spso) | OK, AR, LA, TX | 15 | 3.1 percent (+$0.99 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 3.5 percent (+$1.12 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [SERC Mississippi Valley (SRMV)](https://datacenterrecord.org/grid/srmv) | AR, LA, MS | 22 | 3.0 percent (+$0.93 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 4.7 percent (+$1.48 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | | [FRCC All (FRCC)](https://datacenterrecord.org/grid/frcc) | FL | 33 | 1.0 percent (+$0.42 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | 0.8 percent (+$0.34 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate. | Wholesale price effects are third party estimates from [Dallas Fed WP 2606r1 (opens in a new tab)](https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf) (March 2026, revised October 2026). Tracked record counts are Data Center Record rows licensed under [CC BY-NC 4.0](https://datacenterrecord.org/about#commercial). Study Ledger: 9 electricity price and grid studies ### What researchers have found These studies measure different things. Some model wholesale market prices. Some measure what households actually paid. Some model what would happen under a policy change. The record shows each one as the authors stated it and does not rank them. | Study | What it measured | Finding | Years covered | Method | Who funded or published it | | --- | --- | --- | --- | --- | --- | | [Plante, Carrasco, Miranda Pineda and Patel, Federal Reserve Bank of Dallas Working Paper 2606r1 (opens in a new tab)](https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf) March 2026, revised October 2026 · third party estimate | Wholesale electricity price effect and retail electricity rate pass through | Data center demand accounts for an average 6.5 percent increase in wholesale electricity prices across 23 regional markets in 2024 and 2025, reaching 15.0 percent (+$5.22 per MWh) in SERC Virginia and Carolina North and 15.4 percent (+$5.68 per MWh) in the Northwest Power Pool, with wholesale changes passing into retail prices roughly in proportion to the wholesale share of the retail bill over 12 to 24 months. | 2019 to 2025 historical and 2026 to 2028 scenario projections | Synthetic supply stack model across 23 regional power markets combined with reduced form retail pass through regressions | Federal Reserve Bank of Dallas (government research working paper; views are the authors') | | [Watten, Bistline and Blanford, Electric Power Research Institute (arXiv:2606.19777) (opens in a new tab)](https://arxiv.org/abs/2606.19777) June 2026 · third party estimate · [Fortune, July 26, 2026 (opens in a new tab)](https://fortune.com/2026/07/26/data-centers-electricity-costs-cheaper-7billion-buildout-ai-demand/) | State level retail electricity rate change across all customer classes | Where data centers pay standard industrial rates and improve grid utilization, state average retail rates could fall by roughly 1 percent nationally by 2030 (up to 4 percent in high growth states, or roughly $7 billion per year in fixed cost spreading); outcomes reverse toward higher residential bills if new generation and transmission upgrades outpace load revenues. | 2026 to 2030 | Capacity expansion and utility revenue requirement model allocating fixed transmission and distribution costs across customer classes | Electric Power Research Institute (nonprofit energy research institute funded primarily by member electric utilities) | | [Meeks, Pless, Qi and Wang, MIT Center for Energy and Environmental Policy Research (opens in a new tab)](https://ceepr.mit.edu/workingpaper/who-pays-for-growth-evidence-from-datacenters-and-the-grid/) December 2025 · third party estimate | Realized utility revenue and customer bill changes from historical data center openings | In the 6 years following data center entry (1998 to 2018), average electric utility revenue rose 8 percent (+$104 million per utility per year), residential bills rose 2 percent (+$30 per household per year) and commercial bills rose 4 percent (+$262 per customer per year), driven by peak coincident demand charges and infrastructure capital additions. | 1998 to 2018 | Difference in differences event study of historical data center openings matched to utility level EIA Form 861 billing and revenue panels | MIT Center for Energy and Environmental Policy Research (university working paper) | | [Norris, Profeta, Patino Echeverri and Cowie, Duke University Nicholas Institute (NI R 26-04) (opens in a new tab)](https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade) February 2026 · third party estimate · [Duke Nicholas Institute summary (opens in a new tab)](https://nicholasinstitute.duke.edu/articles/key-takeaways-data-center-flexibility-and-generation-capacity-over-next-decade) | Grid headroom and new gigawatts of large load accommodated under minimal peak hour curtailment | Across 22 major US balancing authorities, roughly 76 GW of new data center load can be integrated without building new peaking capacity if facilities curtail load by 0.25 percent of annual operating hours (roughly 22 hours per year), expanding to 98 GW at 0.5 percent annual curtailment and 126 GW at 1.0 percent annual curtailment. | 2025 to 2035 | Hourly balancing authority load duration and reserve margin modeling across 22 US power systems | Duke University Nicholas Institute for Energy, Environment & Sustainability (university research institute) | | [Jeremiah Johnson et al., North Carolina State University (Environmental Research Letters) (opens in a new tab)](https://doi.org/10.1088/1748-9326/ae6c3d) May 2026 · third party estimate · [NC State University News, May 2026 (opens in a new tab)](https://news.ncsu.edu/2026/05/data-centers-power-bills/) | Wholesale electricity prices, residential bills by state and power sector carbon emissions through 2030 | Projected data center and crypto load growth raises US electricity demand 6 to 12 percent by 2030 and increases residential electricity bills up to 57 percent in the most heavily affected states (including Virginia at roughly $32 per month or $384 per year for an average household) while adding 49 to 125 million metric tons of CO2 per year. | 2024 to 2030 | National capacity expansion and unit commitment dispatch model (TEMOA) across US grid regions | North Carolina State University researchers in Environmental Research Letters (peer reviewed journal) | | [Monitoring Analytics, PJM Independent Market Monitor (Q1 2026 State of the Market Report) (opens in a new tab)](https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2026/2026q1-som-pjm.pdf) May 14, 2026 · third party estimate · [E&E News, May 15, 2026 (opens in a new tab)](https://www.eenews.net/articles/data-centers-drive-76-surge-in-pjm-power-prices/) | PJM Base Residual Auction capacity market clearing prices and total wholesale capacity bill attributable to data center load | Data center load growth was the primary driver of the PJM 2025/2026 and 2026/2027 capacity market tightness, accounting for $9.3 billion of the $14.7 billion total PJM capacity cost in the 2025/2026 delivery year and driving a 76 percent surge in PJM wholesale power costs in Q1 2026. | 2025 to 2027 delivery years and Q1 2026 | Counterfactual PJM Base Residual Auction clearing runs removing forecast and existing data center peak load additions | Monitoring Analytics, LLC (independent market monitor for PJM Interconnection, mandated by FERC) | | [Union of Concerned Scientists, Billions of Dollars in Unreported Data Center Costs in PJM (opens in a new tab)](https://www.ucs.org/sites/default/files/2025-09/PJM%20Data%20Center%20Issue%20Brief%20-%20Sep%202025.pdf) September 2025 · third party estimate · [Harvard Salata Institute interview with Ari Peskoe, March 17, 2026 (opens in a new tab)](https://salatainstitute.harvard.edu/data-centers-ai-artificial-intelligence-grid-permitting-transmission-electricity-energy) | Local transmission network upgrade costs triggered by data center interconnections in PJM | In PJM alone, $4.36 billion in transmission upgrades across 150 supplemental transmission projects in 2024 were triggered by data center connections and socialized across regional utility ratepayers under PJM tariff rules. | 2022 to 2024 PJM transmission expansion filings | Project by project audit of PJM Regional Transmission Expansion Plan (RTEP) and utility Attachment M-3 supplemental project filings | Union of Concerned Scientists (nonprofit advocacy group study) | | [Energy and Environmental Economics (E3), Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers (opens in a new tab)](https://www.ethree.com/wp-content/uploads/2026/05/Understanding-the-Drivers-of-Rising-Electricity-Rates-and-the-Role-of-Data-Centers_E3-2026.pdf) May 2026 · third party estimate | Historical drivers of US retail electricity rate increases and utility rate design for large loads | Historical US retail electricity rate increases from 2020 to 2025 were driven primarily by distribution capital spending, wildfire mitigation, natural gas price spikes and inflation rather than data centers, and well designed large load tariffs can keep new data center additions net neutral or beneficial for existing ratepayers. | 2020 to 2025 historical and forward rate design case studies | Decomposition of historical utility revenue requirements and illustrative utility tariff cost of service modeling | Energy and Environmental Economics (E3), industry commissioned consulting report | | [Nicholas Z. Muller, National Bureau of Economic Research Working Paper 35100 (opens in a new tab)](https://www.nber.org/papers/w35100) April 2026 · third party estimate · [S&P Global Commodity Insights, September 16, 2026 (opens in a new tab)](https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/091626-air-pollution-from-data-center-power-projects-is-a-rising-concern-amid-build-out) | Monetized air pollution and greenhouse gas health and climate damages per megawatt hour of data center electricity use | Marginal air pollution and greenhouse gas damages from fossil fuel generation serving US data centers average $49 to $94 per MWh ($0.049 to $0.094 per kWh), rivaling or exceeding the direct wholesale price of electricity in coal and gas heavy interconnects such as PJM, MISO and SERC. | 2022 to 2025 | Integrated assessment marginal emissions and air quality transport model (AP4T) coupled with EPA CEMS unit level generation data | National Bureau of Economic Research (university working paper by Nicholas Z. Muller, Carnegie Mellon University) | A study is listed here when it is published by a government body, a university, a research institute or a market monitor, or when it is widely cited and its funding is disclosed. Industry commissioned and advocacy group studies are labeled as such. ## The same projects, as a list - [VA Virginia 194 projects](https://datacenterrecord.org/states/va) - [GA Georgia 104 projects](https://datacenterrecord.org/states/ga) - [CA California 82 projects](https://datacenterrecord.org/states/ca) - [PA Pennsylvania 80 projects](https://datacenterrecord.org/states/pa) - [TX Texas 69 projects](https://datacenterrecord.org/states/tx) - [IL Illinois 59 projects](https://datacenterrecord.org/states/il) - [OH Ohio 42 projects](https://datacenterrecord.org/states/oh) - [OR Oregon 40 projects](https://datacenterrecord.org/states/or) - [AZ Arizona 35 projects](https://datacenterrecord.org/states/az) - [NJ New Jersey 35 projects](https://datacenterrecord.org/states/nj) - [FL Florida 33 projects](https://datacenterrecord.org/states/fl) - [NY New York 32 projects](https://datacenterrecord.org/states/ny) - [IN Indiana 29 projects](https://datacenterrecord.org/states/in) - [CO Colorado 28 projects](https://datacenterrecord.org/states/co) - [NC North Carolina 28 projects](https://datacenterrecord.org/states/nc) - [WA Washington 28 projects](https://datacenterrecord.org/states/wa) - [MO Missouri 26 projects](https://datacenterrecord.org/states/mo) - [UT Utah 26 projects](https://datacenterrecord.org/states/ut) - [IA Iowa 25 projects](https://datacenterrecord.org/states/ia) - [MI Michigan 25 projects](https://datacenterrecord.org/states/mi) - [MN Minnesota 25 projects](https://datacenterrecord.org/states/mn) - [WI Wisconsin 21 projects](https://datacenterrecord.org/states/wi) - [TN Tennessee 20 projects](https://datacenterrecord.org/states/tn) - [SC South Carolina 19 projects](https://datacenterrecord.org/states/sc) - [MD Maryland 18 projects](https://datacenterrecord.org/states/md) - [NV Nevada 17 projects](https://datacenterrecord.org/states/nv) - [MA Massachusetts 15 projects](https://datacenterrecord.org/states/ma) - [NE Nebraska 15 projects](https://datacenterrecord.org/states/ne) - [OK Oklahoma 15 projects](https://datacenterrecord.org/states/ok) - [AL Alabama 11 projects](https://datacenterrecord.org/states/al) - [KY Kentucky 9 projects](https://datacenterrecord.org/states/ky) - [WY Wyoming 9 projects](https://datacenterrecord.org/states/wy) - [KS Kansas 8 projects](https://datacenterrecord.org/states/ks) - [LA Louisiana 8 projects](https://datacenterrecord.org/states/la) - [AK Alaska 7 projects](https://datacenterrecord.org/states/ak) - [AR Arkansas 7 projects](https://datacenterrecord.org/states/ar) - [MS Mississippi 7 projects](https://datacenterrecord.org/states/ms) - [ME Maine 6 projects](https://datacenterrecord.org/states/me) - [NH New Hampshire 6 projects](https://datacenterrecord.org/states/nh) - [SD South Dakota 6 projects](https://datacenterrecord.org/states/sd) - [WV West Virginia 6 projects](https://datacenterrecord.org/states/wv) - [CT Connecticut 5 projects](https://datacenterrecord.org/states/ct) - [MT Montana 5 projects](https://datacenterrecord.org/states/mt) - [NM New Mexico 5 projects](https://datacenterrecord.org/states/nm) - [DE Delaware 4 projects](https://datacenterrecord.org/states/de) - [HI Hawaii 4 projects](https://datacenterrecord.org/states/hi) - [ID Idaho 4 projects](https://datacenterrecord.org/states/id) - [ND North Dakota 4 projects](https://datacenterrecord.org/states/nd) - [RI Rhode Island 4 projects](https://datacenterrecord.org/states/ri) - [VT Vermont 4 projects](https://datacenterrecord.org/states/vt) - [DC District of Columbia 3 projects](https://datacenterrecord.org/states/dc) ## Recent tracked projects - [waiting on permits Digital Realty Moores Chapel Road Data Center](https://datacenterrecord.org/projects/digital-realty-moores-chapel-road-charlotte-nc) Digital Realty is seeking a Mecklenburg County air quality permit for a planned data center campus on Moores Chapel Road in west Charlotte that would allow 242 diesel backup generators totaling 726 MW. Charlotte, Mecklenburg County, NC · Capacity not disclosed · Last verified November 16, 2026 - [approved Project Delta](https://datacenterrecord.org/projects/project-delta-walnut-cove-nc) Engineered Land Solutions proposed the Project Delta data center on nearly 1,850 acres near the Dan River in the Walnut Cove area of Stokes County, North Carolina, where county commissioners approved a rezoning 3 to 2 on September 14, 2026 and residents and community groups filed a second Superior Court lawsuit on November 12, 2026. Walnut Cove, Stokes County, NC · Capacity not disclosed · Last verified November 16, 2026 - [running Meta Prineville Data Center Campus](https://datacenterrecord.org/projects/meta-prineville-campus-or) Meta's data center campus in Prineville has 11 buildings totaling 4.6 million square feet, first began construction in 2010, has expanded multiple times, and represents approximately $2 billion in investment, with Milestone Technologies laying off 66 workers there on June 28, 2026 due to contract expiration. Prineville, Crook County, OR · Capacity not disclosed · Last verified November 13, 2026 - [being built Google Cheyenne Data Center Campus (Project Tembo, formerly Project Jade)](https://datacenterrecord.org/projects/cheyenne-1-2-billion-data-center-campus-wy) Google, through Jupiter Star Holdings LLC, is building its first Wyoming data center campus on a 716 acre site in Switchgrass Industrial Park south of Cheyenne in Laramie County, part of a $17 billion investment announced November 5, 2026 with partners Tallgrass Energy, Black Hills Energy, American Electric Power and Related Digital, using Bloom Energy as fuel cell supplier. The campus was first developed by Crusoe with Tallgrass as Project Jade before Google took it over through Jupiter Star Holdings LLC in 2026. Campus load is not disclosed. Cheyenne, Laramie County, WY · Capacity not disclosed · Last verified November 10, 2026 - [proposed LightEdge Ames Municipal Airport Data Center](https://datacenterrecord.org/projects/lightedge-ames-airport-data-center-ia) LightEdge proposed to lease 10.86 acres of municipal airport property in Ames, Story County, Iowa for a data center of about 100,000 square feet and up to 25 MW at full build (developer figures). On July 14, 2026, the Ames City Council voted to delay a decision on the lease and directed staff to pursue data center definitions and utility code changes. On July 28, 2026, the council voted 4 to 2 to pause action on new data center developments until May 1, 2027. Ames, Story County, IA · 25 MW · Last verified November 10, 2026 - [running Aligned Data Centers Plano](https://datacenterrecord.org/projects/aligned-data-centers-plano-tx) Aligned Data Centers lists 3 data centers at Plano, Texas among the sites it operates. Plano, Collin County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Aligned LBB-01](https://datacenterrecord.org/projects/aligned-lbb-01-abernathy-tx) Aligned Data Centers lists a data center at Abernathy, Texas among the sites it operates. Abernathy, Hale County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Centersquare Dallas data center](https://datacenterrecord.org/projects/centersquare-dallas-data-center-tx) Centersquare lists a data center at Dallas, Texas among the sites it operates. Dallas, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Centersquare Fort Worth data center](https://datacenterrecord.org/projects/centersquare-fort-worth-data-center-tx) Centersquare lists a data center at Fort Worth, Texas among the sites it operates. Fort Worth, Tarrant County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Cologix Dallas](https://datacenterrecord.org/projects/cologix-dallas-tx) Cologix lists 3 data centers at Dallas, Texas among the sites it operates. Dallas, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [being built Compass Red Oak campus](https://datacenterrecord.org/projects/compass-red-oak-campus-tx) Compass Datacenters lists a data center at Red Oak, Texas and says it is being built. Red Oak, Ellis County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running CyrusOne Allen DFW3-DFW5](https://datacenterrecord.org/projects/cyrusone-allen-dfw3-dfw5-tx) CyrusOne lists a data center at Allen, Texas among the sites it operates. Allen, Collin County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running CyrusOne Austin AUS2-AUS3](https://datacenterrecord.org/projects/cyrusone-austin-aus2-aus3-tx) CyrusOne lists a data center at Austin, Texas among the sites it operates. Austin, Travis County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running CyrusOne Carrollton DFW1](https://datacenterrecord.org/projects/cyrusone-carrollton-dfw1-tx) CyrusOne lists a data center at Carrollton, Texas among the sites it operates. Carrollton, Denton County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Cyrusone Freestone Campus](https://datacenterrecord.org/projects/cyrusone-freestone-campus-fairfield-tx) The EPA's facility registry lists Cyrusone Freestone Campus at 1400 FM 488, Fairfield, TX 75840 in Fairfield, Texas, with a water permit. Fairfield, Freestone County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running CyrusOne Houston HOU3-HOU4](https://datacenterrecord.org/projects/cyrusone-houston-hou3-hou4-tx) CyrusOne lists a data center at Houston, Texas among the sites it operates. Houston, Harris County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running CyrusOne Lewisville DFW2](https://datacenterrecord.org/projects/cyrusone-lewisville-dfw2-tx) CyrusOne lists a data center at Lewisville, Texas among the sites it operates. Lewisville, Denton County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running CyrusOne San Antonio](https://datacenterrecord.org/projects/cyrusone-san-antonio-tx) CyrusOne lists 3 data centers at San Antonio, Texas among the sites it operates. San Antonio, Bexar County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running DataBank Austin data center](https://datacenterrecord.org/projects/databank-austin-data-center-tx) DataBank lists a data center at Austin, Texas among the sites it operates. Austin, Travis County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running DataBank Dallas data center](https://datacenterrecord.org/projects/databank-dallas-data-center-tx) DataBank lists a data center at Dallas, Texas among the sites it operates. Dallas, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running DataBank Dallas Richardson (DFW2)](https://datacenterrecord.org/projects/databank-dallas-dfw2-richardson-tx) DataBank operates DataBank Dallas Richardson DFW2 through legal entity DataBank Holdings, Ltd. at 904 Quality Way Richardson TX 75081 in Richardson, Dallas County, TX. Primary environmental regulator records (U.S. Environmental Protection Agency and Texas Commission on Environmental Quality) and operator facility specifications confirm commercial colocation operations at the site. Richardson, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running DataBank Dallas Stemmons (DFW6)](https://datacenterrecord.org/projects/databank-dallas-dfw6-tx) DataBank operates DataBank Dallas Stemmons DFW6 through legal entity DataBank Holdings, Ltd. at 8600 Harry Hines Blvd Dallas TX 75235 in Dallas, Dallas County, TX. Primary environmental regulator records (U.S. Environmental Protection Agency and Texas Commission on Environmental Quality) and operator facility specifications confirm commercial colocation operations at the site. Dallas, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running DataBank Dallas Midtown (DFW7)](https://datacenterrecord.org/projects/databank-dallas-dfw7-tx) DataBank operates DataBank Dallas Midtown DFW7 through legal entity DataBank Holdings, Ltd. at 6606 Lyndon B Johnson Fwy Dallas TX 75240 in Dallas, Dallas County, TX. Primary environmental regulator records (U.S. Environmental Protection Agency and Texas Commission on Environmental Quality) and operator facility specifications confirm commercial colocation operations at the site. Dallas, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running DataBank Houston data center](https://datacenterrecord.org/projects/databank-houston-data-center-tx) DataBank lists a data center at Houston, Texas among the sites it operates. Houston, Harris County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running DataBank Plano DFW3](https://datacenterrecord.org/projects/databank-plano-dfw3-tx) DataBank operates the DFW3 data center at 8375 Dominion Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071657222). Plano, Collin County, TX · 9 MW · Last verified November 9, 2026 - [being built DataBank Red Oak Campus](https://datacenterrecord.org/projects/databank-red-oak-campus-dfw9-dfw11-tx) DataBank operates the Red Oak data center campus at 1712 Stainback Rd in Red Oak, Ellis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071849539). Red Oak, Ellis County, TX · 480 MW · Last verified November 9, 2026 - [running DataBank Waco data center](https://datacenterrecord.org/projects/databank-waco-data-center-tx) DataBank lists a data center at Waco, Texas among the sites it operates. Waco, McLennan County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Digital Realty Austin](https://datacenterrecord.org/projects/digital-realty-austin-tx) Digital Realty lists 2 data centers at Austin, Texas among the sites it operates. Austin, Travis County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Digital Realty Dallas](https://datacenterrecord.org/projects/digital-realty-dallas-tx) Digital Realty lists 3 data centers at Dallas, Texas among the sites it operates. Dallas, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Digital Realty Carrollton (DFW12 2440 Marsh Lane)](https://datacenterrecord.org/projects/digital-realty-dfw-2440-marsh-lane-carrollton-tx) Digital Realty operates Digital Realty Carrollton DFW18 2440 Marsh Lane through legal entity Digital Realty Trust, L.P. at 2440 Marsh Ln Carrollton TX 75006 in Carrollton, Dallas County, TX. Primary environmental regulator records (U.S. Environmental Protection Agency and Texas Commission on Environmental Quality) and operator facility specifications confirm commercial colocation operations at the site. Carrollton, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Digital Realty Carrollton (DFW11 4025 Midway Road)](https://datacenterrecord.org/projects/digital-realty-dfw-4025-midway-road-carrollton-tx) Digital Realty operates Digital Realty Carrollton DFW19 4025 Midway Road through legal entity Digital Realty Trust, L.P. at 4025 Midway Rd Carrollton TX 75007 in Carrollton, Denton County, TX. Primary environmental regulator records (U.S. Environmental Protection Agency and Texas Commission on Environmental Quality) and operator facility specifications confirm commercial colocation operations at the site. Carrollton, Denton County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Digital Realty DFW26](https://datacenterrecord.org/projects/digital-realty-dfw26-lewisville-tx) Digital Realty lists a data center at Lewisville, Texas among the sites it operates. Lewisville, Denton County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Digital Realty Houston](https://datacenterrecord.org/projects/digital-realty-houston-tx) Digital Realty lists 2 data centers at Houston, Texas among the sites it operates. Houston, Harris County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Digital Realty Richardson](https://datacenterrecord.org/projects/digital-realty-richardson-tx) Digital Realty lists 7 data centers at Richardson, Texas among the sites it operates. Richardson, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Edgeconnex Houston Holdings, LLC](https://datacenterrecord.org/projects/edgeconnex-houston-holdings-llc-katy-tx) The EPA's facility registry lists Edgeconnex Houston Holdings, LLC at 1510 Primewest Parkway, Katy, TX 77449 in Katy, Texas, with a hazardous waste record. Katy, Harris County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Edged Irving Data Center](https://datacenterrecord.org/projects/edged-irving-data-center-tx) Edged operates the Edged Dallas data center at 4901 N O'Connor Rd in Irving, Dallas County, Texas, using a waterless closed loop cooling system. Irving, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Element Critical Austin (AUS1)](https://datacenterrecord.org/projects/element-critical-austin-aus1-tx) Element Critical operates the AUS1 data center at 8025 N IH 35 in Austin, Travis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035038474). Austin, Travis County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Equinix DA7](https://datacenterrecord.org/projects/equinix-da7-plano-tx) Equinix lists a data center at Plano, Texas among the sites it operates. Plano, Collin County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Equinix DA9](https://datacenterrecord.org/projects/equinix-da9-irving-tx) Equinix lists a data center at Irving, Texas among the sites it operates. Irving, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Equinix Dallas](https://datacenterrecord.org/projects/equinix-dallas-tx) Equinix lists 6 data centers at Dallas, Texas among the sites it operates. Dallas, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Equinix HO1](https://datacenterrecord.org/projects/equinix-ho1-houston-tx) Equinix lists a data center at Houston, Texas among the sites it operates. Houston, Harris County, TX · Capacity not disclosed · Last verified November 9, 2026 - [not yet verified Experian Mckinney Data Center](https://datacenterrecord.org/projects/experian-mckinney-data-center-tx) The EPA's facility registry lists Experian Mckinney Data Center at 3400 S Stonebridge DR, Mckinney, TX 75070 in Mckinney, Texas, with no permit program listed. McKinney, Collin County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Flexential Dallas Plano (DFW01)](https://datacenterrecord.org/projects/flexential-dallasplano-dfw01-plano-tx) Flexential operates the DFW01 data center at 3500 E Plano Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071155467). Plano, Collin County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Flexential Dallas Richardson (RCH01)](https://datacenterrecord.org/projects/flexential-dallasrichardson-rch01-richardson-tx) Flexential operates Flexential Dallas Richardson RCH01 through legal entity Flexential Corp. at 3010 Waterview Pkwy Richardson TX 75080 in Richardson, Collin County, TX. Primary environmental regulator records (U.S. Environmental Protection Agency and Texas Commission on Environmental Quality) and operator facility specifications confirm commercial colocation operations at the site. Richardson, Collin County, TX · Capacity not disclosed · Last verified November 9, 2026 - [not yet verified Ge Capital Data Center](https://datacenterrecord.org/projects/ge-capital-data-center-dallas-tx) The EPA's facility registry lists Ge Capital Data Center at 1100 Empire Central Place, Dallas, TX 75247 in Dallas, Texas, with a hazardous waste record. Dallas, Dallas County, TX · Capacity not disclosed · Last verified November 9, 2026 - [being built Google Armstrong County data center](https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx) Google lists a data center at Armstrong County, Texas and says it is being built. Claude, Armstrong County, TX · Capacity not disclosed · Last verified November 9, 2026 - [being built Google Haskell County data center](https://datacenterrecord.org/projects/google-haskell-county-data-center-tx) Google lists a data center at Haskell County, Texas and says it is being built. Haskell, Haskell County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Google Midlothian data center](https://datacenterrecord.org/projects/google-midlothian-data-center-tx) Google lists a data center at Midlothian, Texas among the sites it operates. Midlothian, Ellis County, TX · Capacity not disclosed · Last verified November 9, 2026 - [being built Google Pampa data center](https://datacenterrecord.org/projects/google-pampa-data-center-tx) Google lists a data center at Pampa, Texas and says it is being built. Pampa, Gray County, TX · Capacity not disclosed · Last verified November 9, 2026 - [running Google Pflugerville Data Center](https://datacenterrecord.org/projects/google-pflugerville-data-center-tx) Google operates the Pflugerville data center in Pflugerville, Travis County, Texas, reported in the Google 2026 Environmental Report with 400,000 gallons of annual water withdrawal in 2025. Pflugerville, Travis County, TX · Capacity not disclosed · Last verified November 9, 2026 ## Sources and data ### Sources on this page | Publisher | Title | Document date | Last verified date | Type | | --- | --- | --- | --- | --- | | Federal Reserve Bank of Dallas | [Data Centers, Wholesale Electricity Prices, and Retail Rates (opens in a new tab)](https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf) | March 2026, revised October 2026 | October 28, 2026 | study | | Electric Power Research Institute (EPRI) | [Retail Electricity Price Implications of Data Center Load Growth (opens in a new tab)](https://arxiv.org/abs/2606.19777) | June 2026 | October 28, 2026 | study | | MIT Center for Energy and Environmental Policy Research (CEEPR) | [Who Pays for Growth? Evidence from Datacenters and the Grid (opens in a new tab)](https://ceepr.mit.edu/workingpaper/who-pays-for-growth-evidence-from-datacenters-and-the-grid/) | December 2025 | October 28, 2026 | study | | Nicholas Institute for Energy, Environment & Sustainability, Duke University | [Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems (opens in a new tab)](https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade) | February 2026 | October 28, 2026 | study | | Environmental Research Letters (IOP Publishing) / North Carolina State University | [Power System Costs and Emissions from Data Center and Cryptocurrency Mining Expansion in the United States (opens in a new tab)](https://doi.org/10.1088/1748-9326/ae6c3d) | May 2026 | October 28, 2026 | study | | Monitoring Analytics, LLC (PJM Independent Market Monitor) | [2026 Quarterly State of the Market Report for PJM: January through March (opens in a new tab)](https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2026/2026q1-som-pjm.pdf) | May 14, 2026 | October 28, 2026 | official record | | Union of Concerned Scientists | [Data Center Transmission Interconnection Costs in PJM (opens in a new tab)](https://www.ucs.org/sites/default/files/2025-09/PJM%20Data%20Center%20Issue%20Brief%20-%20Sep%202025.pdf) | September 2025 | October 28, 2026 | study | | Energy and Environmental Economics, Inc. (E3) | [Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers (opens in a new tab)](https://www.ethree.com/wp-content/uploads/2026/05/Understanding-the-Drivers-of-Rising-Electricity-Rates-and-the-Role-of-Data-Centers_E3-2026.pdf) | May 2026 | October 28, 2026 | study | | National Bureau of Economic Research (NBER) | [The Environmental Externalities of the Data Center Boom (opens in a new tab)](https://www.nber.org/papers/w35100) | April 2026 | October 28, 2026 | study | | WFAE | [Charlotte data center could get backup power from 242 diesel generators (opens in a new tab)](https://www.wfae.org/energy-environment/2026-11-11/charlotte-data-center-could-get-backup-power-from-242-diesel-generators) | November 11, 2026 | November 16, 2026 | news report | | Mecklenburg County Air Quality | [Mecklenburg County Air Quality Public Comment Notice: Digital Realty Trust Moores Chapel (CLT13) Data Center (opens in a new tab)](https://airquality.mecknc.gov/education-engagement/comment) | October 26, 2026 | November 16, 2026 | official record | | The Stokes News | [Stokes County commissioners approve data center rezoning request in 3 to 2 split vote (opens in a new tab)](https://www.thestokesnews.com/business/data-center-zoning-vote-yes-to-rezoning-request-split-vote/article_3c40af84-0996-4797-bae5-3f269a7ac03b.html) | September 15, 2026 | November 16, 2026 | news report | | Southern Coalition for Social Justice | [Residents and groups file a second lawsuit over the Stokes County data center rezoning (opens in a new tab)](https://southerncoalition.org/residents-community-groups-sue-again-over-stokes-county-data-center-rezoning/) | November 13, 2026 | November 16, 2026 | news report | | Meta | [Meta: Our U.S. data center fleet (opens in a new tab)](https://datacenters.atmeta.com/us-locations/) | September 14, 2026 | November 13, 2026 | company statement | | Oregon Department of Environmental Quality | [Oregon DEQ Standard ACDP (OAR 340-216) 07-0037-ST-01 (Vitesse, LLC - Vitesse, LLC) (opens in a new tab)](https://deqonline.deq.state.or.us/AQPermitsonline/07-0037-ST-01_PM_2024_1.PDF) | July 19, 2024 | November 13, 2026 | official record | | Bloomberg Law | [Crusoe Touts 5 Gigawatts of Data Centers, Pauses Wyoming Site (opens in a new tab)](https://news.bloomberglaw.com/artificial-intelligence/crusoe-touts-5-gigawatts-of-data-centers-pauses-wyoming-site) | June 9, 2026 | November 10, 2026 | news report | | Laramie County SmartGov Portal | [Tembo Data Center Conditional Use Permit B (08/13/2026), Case PZ-26-00057 (opens in a new tab)](https://co-laramie-wy.smartgovcommunity.com/PermittingPublic/PermitLandingPagePublic/Index/ba7af803-e81d-4dc6-ae0c-b4790109f396) | September 30, 2026 | November 10, 2026 | official record | | City of Ames | [City of Ames Staff Report on Data Centers (July 14, 2026) (opens in a new tab)](https://www.cityofames.org/files/assets/city/v/1/city-clerk/documents/datacenter/2026.07.14-staff-report-on-data-centers.pdf) | July 14, 2026 | November 10, 2026 | official record | | City of Ames | [Data Center Development Updates, City of Ames (opens in a new tab)](https://www.cityofames.org/Resident-Services/Whats-Happening-in-Ames/Major-Projects/Data-Center-Development-Updates) | September 22, 2026 | November 10, 2026 | official record | | Aligned Data Centers | [Aligned Data Centers: Data center locations (opens in a new tab)](https://aligneddc.com/locations/) | September 14, 2026 | November 9, 2026 | company statement | | Aligned Data Centers | [Aligned Data Centers: Aligned DFW-01 (opens in a new tab)](https://aligneddc.com/dallas-data-centers/) | September 14, 2026 | November 9, 2026 | company statement | | Aligned Data Centers | [Aligned Data Centers: Aligned LBB-01 (opens in a new tab)](https://aligneddc.com/abernathy-tx-data-center/) | September 14, 2026 | November 9, 2026 | company statement | | Centersquare | [Centersquare: Data center markets (opens in a new tab)](https://www.csquare.com/data-centers) | September 14, 2026 | November 9, 2026 | company statement | | U.S. Environmental Protection Agency | [EPA ECHO detailed facility report: Webb Chapel Data Center Dallas (opens in a new tab)](https://echo.epa.gov/detailed-facility-report?fid=110035069127) | | November 9, 2026 | official record | | U.S. Environmental Protection Agency | [EPA ECHO detailed facility report: Centersquare DFW1 Fort Worth (opens in a new tab)](https://echo.epa.gov/detailed-facility-report?fid=110071955710) | | November 9, 2026 | official record | | Data Center Dynamics | [Cologix to open third data center in Dallas - Data Center Dynamics (opens in a new tab)](https://www.datacenterdynamics.com/en/news/cologix-open-third-data-center-dallas/) | October 11, 2019 | November 9, 2026 | news report | | Data Center Knowledge | [Cologix Opens Second Site at Dallas INFOMART - Data Center Knowledge (opens in a new tab)](https://www.datacenterknowledge.com/next-gen-data-centers/cologix-opens-second-site-at-dallas-infomart) | May 31, 2024 | November 9, 2026 | news report | | Compass Datacenters | [Compass Datacenters: Data center markets (opens in a new tab)](https://www.compassdatacenters.com/data-center-markets/) | September 14, 2026 | November 9, 2026 | company statement | | Business Insider | [A Texas developer got a $2 billion loan to build Oracle data centers in the 'burbs - Business Insider (opens in a new tab)](https://www.businessinsider.com/databank-financing-dallas-data-center-inference-2026-4) | April 21, 2026 | November 9, 2026 | news report | | CyrusOne | [CyrusOne: Data centers (opens in a new tab)](https://www.cyrusone.com/data-centers) | September 14, 2026 | November 9, 2026 | company statement | | CyrusOne | [CyrusOne: CyrusOne Allen DFW3-DFW5 (opens in a new tab)](https://www.cyrusone.com/data-centers/north-america/allen-texas) | September 14, 2026 | November 9, 2026 | company statement | | CyrusOne | [CyrusOne: CyrusOne Austin AUS2-AUS3 (opens in a new tab)](https://www.cyrusone.com/data-centers/north-america/austin-texas) | September 14, 2026 | November 9, 2026 | company statement | | U.S. Environmental Protection Agency | [EPA ECHO detailed facility report: Cyrusone, Carrollton Data Center (opens in a new tab)](https://echo.epa.gov/detailed-facility-report?fid=110062195235) | | November 9, 2026 | official record | | U.S. Environmental Protection Agency | [EPA ECHO detailed facility report: Cyrusone Freestone Campus (opens in a new tab)](https://echo.epa.gov/detailed-facility-report?fid=110072106677) | | November 9, 2026 | official record | | CyrusOne | [CyrusOne: CyrusOne Houston HOU3-HOU4 (opens in a new tab)](https://www.cyrusone.com/data-centers/north-america/houston-tx) | September 14, 2026 | November 9, 2026 | company statement | | CyrusOne | [CyrusOne: CyrusOne Lewisville DFW2 (opens in a new tab)](https://www.cyrusone.com/data-centers/north-america/lewisville-texas) | September 14, 2026 | November 9, 2026 | company statement | | CyrusOne | [CyrusOne: CyrusOne San Antonio SAT5-SAT6 (opens in a new tab)](https://www.cyrusone.com/data-centers/north-america/san-antonio-sat5-sat6) | September 14, 2026 | November 9, 2026 | company statement | | DataBank | [DataBank Austin AUS1 Facility Specifications (7128 McNeil Dr, Austin) (opens in a new tab)](https://www.databank.com/data-centers/austin/aus1/) | November 6, 2026 | November 9, 2026 | company statement | | DataBank | [DataBank: Data centers (opens in a new tab)](https://www.databank.com/data-centers/) | September 14, 2026 | November 9, 2026 | company statement | | Data Center Knowledge | [DataBank Acquired by Avista Capital - Data Center Knowledge (opens in a new tab)](https://www.datacenterknowledge.com/business/databank-acquired-by-avista-capital) | June 1, 2024 | November 9, 2026 | news report | ### What researchers have found These studies measure different things. Some model wholesale market prices. Some measure what households actually paid. Some model what would happen under a policy change. The record shows each one as the authors stated it and does not rank them. These studies measure different things. Some model wholesale market prices. Some measure what households actually paid. Some model what would happen under a policy change. The record shows each one as the authors stated it and does not rank them. | Study | What it measured | Finding | Years covered | Method | Who funded or published it | | --- | --- | --- | --- | --- | --- | | [Plante, Carrasco, Miranda Pineda and Patel, Federal Reserve Bank of Dallas Working Paper 2606r1 (opens in a new tab)](https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf) March 2026, revised October 2026 · third party estimate | Wholesale electricity price effect and retail electricity rate pass through | Data center demand accounts for an average 6.5 percent increase in wholesale electricity prices across 23 regional markets in 2024 and 2025, reaching 15.0 percent (+$5.22 per MWh) in SERC Virginia and Carolina North and 15.4 percent (+$5.68 per MWh) in the Northwest Power Pool, with wholesale changes passing into retail prices roughly in proportion to the wholesale share of the retail bill over 12 to 24 months. | 2019 to 2025 historical and 2026 to 2028 scenario projections | Synthetic supply stack model across 23 regional power markets combined with reduced form retail pass through regressions | Federal Reserve Bank of Dallas (government research working paper; views are the authors') | | [Watten, Bistline and Blanford, Electric Power Research Institute (arXiv:2606.19777) (opens in a new tab)](https://arxiv.org/abs/2606.19777) June 2026 · third party estimate · [Fortune, July 26, 2026 (opens in a new tab)](https://fortune.com/2026/07/26/data-centers-electricity-costs-cheaper-7billion-buildout-ai-demand/) | State level retail electricity rate change across all customer classes | Where data centers pay standard industrial rates and improve grid utilization, state average retail rates could fall by roughly 1 percent nationally by 2030 (up to 4 percent in high growth states, or roughly $7 billion per year in fixed cost spreading); outcomes reverse toward higher residential bills if new generation and transmission upgrades outpace load revenues. | 2026 to 2030 | Capacity expansion and utility revenue requirement model allocating fixed transmission and distribution costs across customer classes | Electric Power Research Institute (nonprofit energy research institute funded primarily by member electric utilities) | | [Meeks, Pless, Qi and Wang, MIT Center for Energy and Environmental Policy Research (opens in a new tab)](https://ceepr.mit.edu/workingpaper/who-pays-for-growth-evidence-from-datacenters-and-the-grid/) December 2025 · third party estimate | Realized utility revenue and customer bill changes from historical data center openings | In the 6 years following data center entry (1998 to 2018), average electric utility revenue rose 8 percent (+$104 million per utility per year), residential bills rose 2 percent (+$30 per household per year) and commercial bills rose 4 percent (+$262 per customer per year), driven by peak coincident demand charges and infrastructure capital additions. | 1998 to 2018 | Difference in differences event study of historical data center openings matched to utility level EIA Form 861 billing and revenue panels | MIT Center for Energy and Environmental Policy Research (university working paper) | | [Norris, Profeta, Patino Echeverri and Cowie, Duke University Nicholas Institute (NI R 26-04) (opens in a new tab)](https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade) February 2026 · third party estimate · [Duke Nicholas Institute summary (opens in a new tab)](https://nicholasinstitute.duke.edu/articles/key-takeaways-data-center-flexibility-and-generation-capacity-over-next-decade) | Grid headroom and new gigawatts of large load accommodated under minimal peak hour curtailment | Across 22 major US balancing authorities, roughly 76 GW of new data center load can be integrated without building new peaking capacity if facilities curtail load by 0.25 percent of annual operating hours (roughly 22 hours per year), expanding to 98 GW at 0.5 percent annual curtailment and 126 GW at 1.0 percent annual curtailment. | 2025 to 2035 | Hourly balancing authority load duration and reserve margin modeling across 22 US power systems | Duke University Nicholas Institute for Energy, Environment & Sustainability (university research institute) |